A carpenter contracts to do a job.The costs for the job are$2,000 for materials,$500 for labor, and $150 for equipment rental.What would be the total cost of the job if the cost of materials were increased by 15%. 1.$300 2.2300 3.2600 4.2800 5.2950

asked
User Awesome
by
8.2k points

1 Answer

5 votes
i think that the answer is 2,800