asked 53.6k views
5 votes
Mr. Stephens needs to haul 1,518 tons of rock from a construction site. His dump truck can hold 26 tons per load. How many tons will Mr. Stephens need to haul in the last load to move all of the rock?

asked
User Lochlan
by
8.3k points

1 Answer

5 votes
Mr Stephens will need to haul in 58.4 tons o move all of the rocks
answered
User JohnnyFun
by
8.9k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.