asked 36.6k views
0 votes
A copy machine is available 24 hours a day. on a typical day, the machine produces 100 jobs. each job takes about 3 minutes on the machine, 2 minutes of which is processing time and 1 minute is setup time

asked
User Tan Wang
by
7.9k points

1 Answer

6 votes
(a)n = 1037
(b) assume 87%n= 469
-express the previous estimate, 95% as a decimal
p^= 0.05
n= [2.576]^2(0.95)(1-0.95)/0.06^2= 88
(c) does the additional survey information from part (b) have much of an effect on the sample size that is required?
yes, using the additional survey information from part (b) dramatically reduces the sample size
answered
User Anique
by
9.2k points

No related questions found

Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.