In an agile project, teams are given several requirements but only deal with one at a time, with each iteration being referred to as a __________.

asked
User SLoret
by
8.1k points

1 Answer

4 votes

The iteration that are each being referred is a sprint. A sprint is being defined as a time that is being set in which are done in order to meet the tasks that is needed to be made for it to be accepted or to complete them.