The ________________ variance is the difference between the actual variable overhead costs and the budgeted variable overhead for actual production.

asked
User Raffy
by
8.5k points

1 Answer

2 votes
the variable overhead spending variance is the difference between the actual variable overhead costs and the budgeted variable overhead for actual production.
These type of variance often cause by inefficiencies when utilizing the total raw materials that the company bought into actual products that're ready to be sold in the market.