asked 212k views
2 votes
determine the quantity of work done when a crane lifts a 100-n block from 2m above the ground to 6m above the ground

2 Answers

4 votes
100n divided by 8m because 2m and 6m are like terms. Hope that helps:)
answered
User CharlesS
by
7.4k points
6 votes
Work done = Force.Δx
Work done = 100(6-2). cos(180°) = -100 (4) = -400 J.
Work done is negative because force acting on the block and its displacement are in opposite direction. Hope this helps!
answered
User Kwex
by
7.9k points