asked 232k views
1 vote
A team of geologists is surveying glaciers on a mountain. they come across a newly formed stream. the stream is flowing at an average rate of 420 cubic meters per minute. at the average rate of flow, the stream will produce 14,700 cubic meters of water in ?? minutes.

2 Answers

3 votes

14,700 ÷ 420 = 35 minutes!

answered
User Yassine Bridi
by
7.8k points
4 votes
The stream is flowing at an average rate of: 420 m³ / min.
14,700 m³ : 420 m³ / min = 35 min.
Answer: The steam will produce 14,700 cubic meters of water in 35 minutes.
answered
User Jzeef
by
7.4k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.