asked 14.0k views
3 votes
Tim and Tom are painters. Tim and Tom are painting a crate. Tom paints 10 sq ft per minute. They painted a particular crate in 1 day. Tim uses a sprayer and is 3.5 times as fast as Tom. How long would it take them to paint a crate with twice the volume and of similar shape? Use the given information to provide the desired estimate. If necessary, enter the answer to the nearest hundredth.

asked
User Nerissa
by
8.7k points

1 Answer

0 votes
Tom-------------- >10 sq ft per minute

Tim------------------- >3.5*10=35 sq ft per minute

Both painters (10+35)=45 sq ft per minute

let's assume a cubic unit crate----------> V1=1*1*1=1 feet3

the total surface of the cube is S1=6*(1*1)=6 sq ft

if the volume of the cube increases twice

V2=2 feet3 ------------------- > 2=x*x*x------------- >x=2^(1/3)

And the S2=6*(2^(1/3)* 2^(1/3)=9.5244 sq ft

V2/V1=9.5244/6=1.5874

Therefore

If Tim and Tom----------------------- > take 1 day----------- > to paint a crate V1

For the crate V2------------- > take 1.5874 days

assuming an 8-hour work day

0.5874*8=4.70 hr-------------- > 4 h 42 min

The answer is 1 day 4h 42 min

answered
User Ilea Cristian
by
8.1k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.