asked 21.5k views
3 votes
Ashley needs 4.6 yards of chain to hang some flower baskets. The chain is sold by the meter. She knows that 1 yard ~ 0.914 meter. How many meters does Ashley need?

asked
User Shalamus
by
8.4k points

2 Answers

3 votes
4.2044 meters.

To get the answer, we must multiply the two values together, because by doing so we will lower the amount in yards to the amount in meters. 4.6 times 0.914 is precisely 4.2044 meters. Round if needed.
answered
User Carpics
by
7.7k points
4 votes
0.914 * 4.6 = 4.2044 Meters

Hope this helps
answered
User Travis Osterman
by
8.2k points