An all-equity firm is considering the projects shown below. the t-bill rate is 5 percent and the market risk premium is 8 percent. project expected return beta a 8 % 0.3 b 20 % 1.1 c 14 % 1.3 d 18 % 1.5 calculate the project-specific benchmarks for each project.

1 Answer

5 votes
I think it’s c———————-