asked 177k views
4 votes
A dressmaker can sew 400 garments with 100 bolts of fabric and 1,500 hours of labor. Another dressmaker can sew 400 garments with 150 bolts of fabric and 1,000 hours of identical labor. Fabric costs $110 a bolt and labor costs $20 an hour. Is it possible for both methods to be economically efficient

1 Answer

8 votes

Answer:

No, because the second method has lower total costs of production.

Step-by-step explanation:

In a bid to make profits businesses must always compare different processes and choose the cheapest one.

This will eventually reflect in the profitability of the business.

In this instance let's get the cost of each process.

Fabric costs $110 a bolt and labor costs $20 an hour.

The first dress maker can sew 400 garments with 100 bolts of fabric and 1,500 hours of labour

Total cost = (100 bolts * 110) + (1500 * 20)

Total cost = $41,000

For the second dress maker he can sew 400 garments with 150 bolts of fabric and 1,000 hours of identical labour

Total cost = (150 *110) + (1000 * 20)

Total cost = $36,500

As can be seen the second dressmaker has a lower cost of production so he is more efficient than the first dress maker

answered
User Shy Agam
by
8.3k points

Related questions

Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.