asked 135k views
0 votes
During a dig, an archaeological team starts at an elevation of −512 feet. At a rate of 234 feet per hour, the team digs deeper into the surface for 312 hours. For the next 412 hours, the team digs at a rate of 1512 feet per hour. Then the team quits for the day.How many feet did the archaeological team dig after 312 hours? feetWhat was the team's elevation at the end of the day?

asked
User Silvar
by
7.7k points

1 Answer

5 votes
Their elevation on that day is -5 1/2 -16= -21 1/2 feet
answered
User Adamnfish
by
8.7k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.