Answer:
Option C: 126
Explanation:
Total displays to be assembled = 280
25% of the displays are assembled during the first hour, this value becomes:

Remaining displays =

40% of the remaining displays during the second hour, the value becomes:

Hence, number of displays that will not have been assembled by the end of the second hour =

Therefore, the answer is 126.