The Risk Management Plan describes the methodology, roles and responsibilities, budgeting, timing and risk categories for potential causes of risk. These risk categories can be structured into a hierarchical representation called a(n):

a. organizational breakdown structure (OBS)
b. risk breakdown structure (RBS)
c. work breakdown structure (WBS)
d. requirements breakdown structure (RBS)

asked
User Lemm Ras
by
8.4k points

1 Answer

4 votes

Answer:

B. Risk Breakdown Structure (RBS)

Step-by-step explanation:

In project management, the resource breakdown structure (RBS) is a various leveled rundown of resources related by capacity and resource type that is utilized to encourage arranging and controlling of project work.