asked 10.2k views
0 votes
The charge for a plumbing repair was $29.60 for parts, 1 1/4 hr. For labor at $56 per hr. And a $40 for the service call. What was the total cost (c) of the repair?​

asked
User Krsteeve
by
8.0k points

1 Answer

6 votes

Answer: $139.60

Explanation:

$40 for coming

$29.60 for parts

56 times 1.25 for labor = 70

70 + 29.6 + 40 = 139.6

answered
User Alex Johnson
by
8.0k points
Welcome to Qamnty — a place to ask, share, and grow together. Join our community and get real answers from real people.